Our Airport projects

Domedoeva Terminal 2

Asbuilt Documents and Design control

Project period > 2017-2018

ANNA GULENOK

Chief Designer - BIM Team of MYCEM JSC

Architectural design and Mep scope

Pulkova International Terminal 2

Contractor > ICTAS - ASTALDI JV

Subcontractor > OAO MYCEM - St Petersburg -Russia

Project period > 2014-2015

The HVAC commissioning work at the airport terminal involves the thorough inspection and testing of the heating, ventilation, and air conditioning systems. This crucial process ensures that the HVAC systems are functioning efficiently and effectively to provide optimal comfort and air quality for passengers and staff. The commissioning team will meticulously check the equipment, controls, and overall system performance to identify any issues or necessary adjustments. They will verify that the airflow, temperature, humidity, and air distribution meet the specified requirements. Additionally, they will assess the system's energy efficiency, safety measures, and compliance with regulatory standards. After completing the commissioning work, the HVAC systems will be fully operational, ensuring a pleasant and comfortable environment within the airport terminal.

İstanbul Grand Airport (İGA)

Design scope and documentation

Project period : 2016-2017

Project duration : 46 months

Total construction area : 3.500.000 m2

Terminal building 1.300.000 m2

sub service buildings 1.500.000 m2

Carpark area 700.000 m2

Total 3.500.000 m2

HVAC Duct, HVAC Pipe, Plumbing ve Fire Fighting systems

Revit program and 3D Coordination - SDR - Shopdrawing - Asbuilt

Revit - 3D - BIM / Mechanical scope

Design & Coordination / Mechanical Equipments

Our Shopping Center Projects

Our Sport - Pool and Fitness Projects

HOTEL PROJECTS

Oil refinery , Natural Gas Process Projects

Moscowcity project